国产操b视频,日韩欧美二三四五六,中文无码淫,伊人婷婷激情五月天

<p id="qsurz"></p>

  • Welcome to the official website of Tianjin Yixin Pipeline Equipment Co., Ltd!
    Tianjin Yixin Pipe Equipment Co., Ltd.
    • Home
    • Products
    • Projects
    • News
    • AboutUs
    English English
    • 中文 中文
    >> Pipeline all position automatic welding machine
    Pipeline all position automatic welding machine
    >> Supporting equipment
    Supporting equipment
    >> Company News
    Company News
    >> Industry News
    Industry News
    >> Common Question
    Common Question
    >> After-Sale Service
    After-Sale Service
    >> Advantage
    Advantage
    >> About
    About
    >> Contact
    Contact
    >> honers
    honers
    • Home
    • Products
      • >> Pipeline all position automatic welding machine
      • >> Supporting equipment
    • Projects
    • News
      • >> Company News
      • >> Industry News
      • >> Common Question
      • >> After-Sale Service
    • AboutUs
      • >> About
      • >> Contact
      • >> honers
    • English
      • 中文
    01-video
    Tianjin Yixin Pipeline Automatic Welding Equipment
    Tianjin Yixin makes welding more efficient and convenient
    05pic
    Pipeline all position intelligent welding machine
    Made in China serving the world
    02pic
    Low labor intensity high efficiency high qualification rate
    Improve the competitiveness of engineering construction
    03pic
    Quality-based creative breakthrough
    Tianjin Yixin is selected for pipeline welding equipment
    01pic
    Breadcrumb: Home > News > Industry News >

    Shandong Linshu steam pipeline network

    Time:2016-03-27

    In order to solve the energy supply imbalance in park enterprises, reduce production costs, at the same time in order to cooperate with atmospheric pollution prevention and control work, resolutely defend "LinShu blue", overall planning, decisive ShiCe LinShu economic development zone, adhere to the "high starting point positioning, high standard planning, building high quality", to promote the steam pipe network construction within their respective jurisdictions.

    It is understood that in 2016, the economic development zone steam pipe network construction project has been launched, plans to invest 8.9 million yuan, laying 7.2 kilometers of pipe network, to ensure normal operation in June. Up to now, the three sections of the steam pipe network construction in the economic development zone are under intensive and orderly construction. The bridge is under construction from the north to the south of the imperial group courtyard wall.(2) south of xingdajie, oxleg ditch bridge to the county chemical plant is under construction, support pillars have been completed.(3) a total of 334 meters east of Haiyou ruida courtyard wall, a total of 53 dunzi dug, 49 of them have been hit cushion.(Ken peng)

    Previous: Next:Chongqing plans to reform residential water meters
    Back

    Contact:Manager Chen

    Tel:+86-22-23889667

    Mobile:+86 13820221715

       +86 13194693183

    Copyright:COPYRIGHT ? 2016-2025 yixinpipe ALL RIGHTS RESERVED

    Support:Junyuan

    Address:No.28 Mold Park B4, Saida Fourth Branch Road, Xiqing Development Zone, Tianjin

    感谢您访问我们的网站,您可能还对以下资源感兴趣:

    国产操b视频