国产操b视频,日韩欧美二三四五六,中文无码淫,伊人婷婷激情五月天

<p id="qcsv4"></p><center id="qcsv4"></center>
  1. <label id="qcsv4"><meter id="qcsv4"></meter></label>
    <label id="qcsv4"></label>
      <code id="qcsv4"></code>
      <object id="qcsv4"><li id="qcsv4"></li></object>
      Welcome to the official website of Tianjin Yixin Pipeline Equipment Co., Ltd!
      Tianjin Yixin Pipe Equipment Co., Ltd.
      • Home
      • Products
      • Projects
      • News
      • AboutUs
      English English
      • 中文 中文
      >> Pipeline all position automatic welding machine
      Pipeline all position automatic welding machine
      >> Supporting equipment
      Supporting equipment
      >> Company News
      Company News
      >> Industry News
      Industry News
      >> Common Question
      Common Question
      >> After-Sale Service
      After-Sale Service
      >> Advantage
      Advantage
      >> About
      About
      >> Contact
      Contact
      >> honers
      honers
      • Home
      • Products
        • >> Pipeline all position automatic welding machine
        • >> Supporting equipment
      • Projects
      • News
        • >> Company News
        • >> Industry News
        • >> Common Question
        • >> After-Sale Service
      • AboutUs
        • >> About
        • >> Contact
        • >> honers
      • English
        • 中文
      01-video
      Tianjin Yixin Pipeline Automatic Welding Equipment
      Tianjin Yixin makes welding more efficient and convenient
      05pic
      Pipeline all position intelligent welding machine
      Made in China serving the world
      02pic
      Low labor intensity high efficiency high qualification rate
      Improve the competitiveness of engineering construction
      03pic
      Quality-based creative breakthrough
      Tianjin Yixin is selected for pipeline welding equipment
      01pic
      Breadcrumb: Home > News > Industry News >

      Shenyang city to transform cross-river pipeline

      Time:2016-03-27

      Dahuofang water transmission project south tower water distribution plant water transmission line transformation project has broken ground on March 1, the entire transformation pipeline length of 6.5 kilometers, is expected to be completed in mid-April. The project will provide a comprehensive guarantee for the water supply safety of Shenhe area and Hunnan area.

      According to Shenyang water group, the DN2000 water transmission line of Dahuofang first phase water delivery project south tower water distribution plant is a prestressed concrete pipe, which was produced in the late 1980s.At the same time, the muddy Hebei dike (Shen waterway) through which the pipeline passes has been rolled by heavy vehicles for a long time, and the road surface is partially subsidence, which is a great test to the pressure bearing capacity of the pipeline. Shenyang municipal government listed a special urban construction plan to solve the water supply safety hidden trouble.

      In this project, a DN1200mm pipeline (steel and plastic composite pipe) across the Hunhe river will be built to replace the original DN2000mm pipeline. After the docking of the new pipeline, the replaced DN2000mm pipeline will be transformed and the lining will be strengthened. During the construction period, the water shortage caused by the decrease of pipe diameter will be made up by the hot water Wells of underground water source used by Sanshui plant to guarantee the water use during peak hours.

      The person in charge of construction unit introduces, this project is to cross Hun river conduit project, river face works width is 450 meters, wade river part total length 1210 meters (include cross Hebei bank dike).First, the construction of grooving should be carried out to cut off the river water in the main channel by building cofferdams on both sides. After that, the river water between the cofferdams on both sides should be drained by digging precipitation Wells. Then, the laying of the pipeline across the river should be completed.

      At present, the river crossing pipeline laying project establishes cofferdams and excavates the foundation pit, and has carried out a total of 350,000 cubic meters of earth and stone, and completed the pipeline laying of more than 200 meters. The construction unit is working 24 hours, and 6 excavators are working at the same time to catch up on the progress.

       

      Previous: Next:Guangxi Debao natural gas pipeline project
      Back

      Contact:Manager Chen

      Tel:+86-22-23889667

      Mobile:+86 13820221715

         +86 13194693183

      Copyright:COPYRIGHT ? 2016-2025 yixinpipe ALL RIGHTS RESERVED

      Support:Junyuan

      Address:No.28 Mold Park B4, Saida Fourth Branch Road, Xiqing Development Zone, Tianjin

      感谢您访问我们的网站,您可能还对以下资源感兴趣:

      国产操b视频
      <li id="4memy"></li>
    • <tr id="4memy"><nav id="4memy"></nav></tr>
        <code id="4memy"><dfn id="4memy"></dfn></code>
          <xmp id="4memy"><samp id="4memy"></samp></xmp>